Levco

Fitout Construction was engaged as a "one-stop-shop". We were responsible for the design, demolition, construction and Council requirements (obtaining the permit and organising Council inspections etc).

A major part of the construction work was to demolish an existing unpermitted raised mezzanine floor, carry out council approved structural support and install flush flooring to the existing flooring height to achieve a seamless office flooring system.

I believe the before and after photos speak for themselves. A very dated office environment was replaced by a sharp, modern office space that the Client is very happy with.