Mojo

Level 4, Textile Centre, Parnell

An existing part height office wall required removal and replaced by a full height wall. A double glass door which was in storage needed to be incorporated in to this wall.

High scaffolding was required to construct this new wall. Work was carried out outside normal working hours so as not to disturb the existing working environment.